9/27/2019: Weekend Traffic Advisory

A stage of construction (toll plaza slab installations) will occur along the Newark Bay - Hudson County Extension (NB-HCE), starting at 8:00 PM on Friday, September 27, 2019 and lasting until 5:00 AM on Monday, September 30, 2019. Over this period, the Eastbound and Westbound roadways on the structure will be reduced to one lane and the following will be closed:

  • Left lane of the Eastbound (HWE) roadway, along with toll lanes 4-7

  • Left lane of the Westbound (HEW) roadway, along with toll lanes 8 & 9

It is anticipated that traffic impacts will be moderate to severe during peak travel periods, typically 10:00 AM - 7:00 PM Saturday and Sunday.

Variable message signs to alert motorists of the construction will be placed along the Eastbound Roadway one week in advance of the planned construction start date.  

Motorists can call 511 from any phone from a hands-free device (Listen for the initial voice prompt and ask for traffic conditions. Motorists can ask for a specific Highway, City, or even a point of interest).  Information regarding this project is posted on our web site at http://www.njta.com/our-projects/new-jersey-turnpike.  Residents of Jersey City / Hudson County can monitor traffic conditions by accessing Turnpike webcams at http://www.njta.com/travel-resources/camera-list, and http://www.511nj.org/cameras.aspx.  Motorists can also download the SafeTrip App for the latest traffic Advisories.


Project:  New Jersey Turnpike Contract T100.321. Rehabilitation of Structure Nos. N6.49, N6.80E and N6.80W, Milepost N5.80 to N8.20

Route/Direction/MP:  New Jersey Turnpike Newark Bay-Hudson County Extension (NB-HCE)/ I-78 Eastbound / Westbound - Milepost N5.10 to N7.30 in Jersey City, NJ

Municipality/County:  Jersey City / Hudson County

Nature of work:  Construction of toll plaza slab installations

Description of New Traffic Pattern:  A stage of construction (toll plaza slab installations) will occur along the Newark Bay - Hudson County Extension (NB-HCE), starting Friday night, September 27, 2019 at 8:00 PM and lasting until Monday morning, September 30, 2019 at 5:00 AM. Over this period, the Eastbound and Westbound roadways on the structure will be reduced to one lane and the following will be closed:

  • Left lane of the Eastbound (HWE) roadway, along with toll lanes 4-7

  • Left lane of the Westbound (HEW) roadway, along with toll lanes 8 & 9

Proposed Start Date of New Traffic Pattern:  The new traffic pattern is scheduled to be installed Friday, September 27, 2019 at 8:00 PM, and be in place until Monday, September 30, 2019 at 5:00 AM.

Anticipated Traffic Impacts:  It is anticipated that traffic impacts will be moderate to severe during peak travel periods, typically 10:00 AM - 7:00 PM Saturday and Sunday.

Other Comments:  NJTA will advise motorists by Highway Advisory Radio and Overhead Variable Message Signs at Newark Bay - Hudson County Extension Mileposts N1.1 and N4.4.  Coordination with TRANSCOM, PANYNJ, local jurisdictions, and NJDOT is ongoing.