4/26/2019: Weekend Traffic Advisory (Westbound)

Newark Bay Bridge (Interchange 14-14C):

Eastbound:  No closures scheduled.

Westbound:  Westbound Interchange 14C – 14A: Traffic will be reduced to one lane from 8P Friday to 5A Monday between milepost N6.0 – N3.3 (Westbound Ramp to 14A). This work has been coordinated with westbound Pulaski Skyway, which will remain open during peak periods Saturday and Sunday. This closing is necessary to address high priority and emergent bridge deck repairs in the westbound travel lanes. In the event of rain Friday night, this closing will be installed early Saturday morning.

Jersey City (Jersey Avenue - Interchange 14C) – The New Jersey Turnpike Authority advises of weekend construction on the Hudson County Extension eastbound approaching Interchange 14B to east of Interchange 14C in Jersey City, the left lane will be closed from 8 p.m., Friday, April 26th, until 5 a.m., Monday, April 29th. During the same hours the left side of the 14C Toll Plaza will closed. Motorist can expect delays during peak periods on the weekend and should allow for extra travel time

For current traffic conditions:

Real-time information about travel conditions is available by calling 511 or downloading the SafeTripNJ app. Live views of the highway are available on the Traffic Cameras page of the Turnpike Authority website ( https://www.njta.com/travel-resources/camera-list).