New Traffic Pattern Advisory: October 2019 – April 2020

A stage of bridge deck reconstruction and miscellaneous improvements will occur in the Eastbound direction of the Newark Bay - Hudson County Extension (NB-HCE) from the Interchange 14C Toll Plaza to Milepost N7.3 (over Christopher Columbus Dr.) starting on Friday, October 25, 2019 and lasting until the end of April 2020. The new traffic pattern will maintain one lane of traffic traffic on the Christopher Columbus Off Ramp. The right lane on the Christopher Columbus Off-Ramp will be reopened, while the left lane will be closed for a long-term stage of bridge deck reconstruction. No shoulders will be present, but emergency pull-off locations and on-site wrecker service will be provided.

It is anticipated that traffic impacts will be moderate during peak travel periods until motorist become accustom to the new traffic pattern.

Variable message signs to alert motorists of the construction will be placed along the Eastbound Roadway at Mileposts N4.7 and N5.9 one week in advance of the planned construction start date.

Motorists can call 511 from any phone from a hands-free device (Listen for the initial voice prompt and ask for traffic conditions. Motorists can ask for a specific Highway, City, or even a point of interest).  Information regarding this project is posted on our web site at http://www.njta.com/our-projects/new-jersey-turnpike. Residents of Jersey City / Hudson County can monitor traffic conditions by accessing Turnpike webcams at http://www.njta.com/travel-resources/camera-list, and http://www.511nj.org/cameras.aspx.  Motorists can also download the SafeTrip App for the latest traffic Advisories.

Read More

10/11/2019: Weekend Traffic Advisory

A stage of construction (toll plaza slab installations) will occur along the Newark Bay - Hudson County Extension (NB-HCE), starting at 8:00 PM on Friday, October 11, 2019 and lasting until 5:00 AM on Monday, October 14, 2019. Over this period, the following will be CLOSED along the Eastbound roadway:

  • Right lane of the Eastbound (HWE) roadway (two lanes remain open)

  • Liberty Science Center Ramp

  • Toll lanes 1-4

It is anticipated that traffic impacts will be moderate to severe during peak travel periods, typically 10:00 AM - 7:00 PM Saturday and Sunday.

Variable message signs to alert motorists of the construction will be placed along the Eastbound Roadway one week in advance of the planned construction start date.  

Motorists can call 511 from any phone from a hands-free device (Listen for the initial voice prompt and ask for traffic conditions. Motorists can ask for a specific Highway, City, or even a point of interest).  Information regarding this project is posted on our web site at http://www.njta.com/our-projects/new-jersey-turnpike.  Residents of Jersey City / Hudson County can monitor traffic conditions by accessing Turnpike webcams at http://www.njta.com/travel-resources/camera-list, and http://www.511nj.org/cameras.aspx.  Motorists can also download the SafeTrip App for the latest traffic Advisories.

Read More

10/4/2019: Weekend Traffic Advisory

A stage of construction (toll plaza slab installations) will occur along the Newark Bay - Hudson County Extension (NB-HCE), starting at 8:00 PM on Friday, October 4, 2019 and lasting until 5:00 AM on Monday, October 7, 2019. Over this period, the following will be closed along the Eastbound roadway:

  • Right lane of the Eastbound (HWE) roadway (two lanes remain open)

  • Liberty Science Center Ramp

  • Toll lanes 1-4

It is anticipated that traffic impacts will be moderate to severe during peak travel periods, typically 10:00 AM - 7:00 PM Saturday and Sunday.

Variable message signs to alert motorists of the construction will be placed along the Eastbound Roadway one week in advance of the planned construction start date.  

Motorists can call 511 from any phone from a hands-free device (Listen for the initial voice prompt and ask for traffic conditions. Motorists can ask for a specific Highway, City, or even a point of interest).  Information regarding this project is posted on our web site at http://www.njta.com/our-projects/new-jersey-turnpike.  Residents of Jersey City / Hudson County can monitor traffic conditions by accessing Turnpike webcams at http://www.njta.com/travel-resources/camera-list, and http://www.511nj.org/cameras.aspx.  Motorists can also download the SafeTrip App for the latest traffic Advisories.

Read More

9/27/2019: Weekend Traffic Advisory

A stage of construction (toll plaza slab installations) will occur along the Newark Bay - Hudson County Extension (NB-HCE), starting at 8:00 PM on Friday, September 27, 2019 and lasting until 5:00 AM on Monday, September 30, 2019. Over this period, the Eastbound and Westbound roadways on the structure will be reduced to one lane and the following will be closed:

  • Left lane of the Eastbound (HWE) roadway, along with toll lanes 4-7

  • Left lane of the Westbound (HEW) roadway, along with toll lanes 8 & 9

It is anticipated that traffic impacts will be moderate to severe during peak travel periods, typically 10:00 AM - 7:00 PM Saturday and Sunday.

Variable message signs to alert motorists of the construction will be placed along the Eastbound Roadway one week in advance of the planned construction start date.  

Motorists can call 511 from any phone from a hands-free device (Listen for the initial voice prompt and ask for traffic conditions. Motorists can ask for a specific Highway, City, or even a point of interest).  Information regarding this project is posted on our web site at http://www.njta.com/our-projects/new-jersey-turnpike.  Residents of Jersey City / Hudson County can monitor traffic conditions by accessing Turnpike webcams at http://www.njta.com/travel-resources/camera-list, and http://www.511nj.org/cameras.aspx.  Motorists can also download the SafeTrip App for the latest traffic Advisories.

Read More

9/20/2019: Weekend Traffic Advisory

A stage of construction (toll plaza slab installations) will occur along the Newark Bay - Hudson County Extension (NB-HCE), starting at 8:00 PM on Friday, September 20, 2019 and lasting until 5:00 AM on Monday, September 23, 2019. Over this period, the Eastbound and Westbound roadways on the structure will be reduced to one lane and the following will be closed:

  • Left lane of the Eastbound (HWE) roadway, along with toll lanes 5-7.

  • Left lane of the Westbound (HEW) roadway, along with toll lanes 8 & 9.

It is anticipated that traffic impacts will be moderate to severe during peak travel periods, typically 10:00 AM - 7:00 PM Saturday and Sunday.

Variable message signs to alert motorists of the construction will be placed along the Eastbound Roadway one week in advance of the planned construction start date.  

Motorists can call 511 from any phone from a hands-free device (Listen for the initial voice prompt and ask for traffic conditions. Motorists can ask for a specific Highway, City, or even a point of interest).  Information regarding this project is posted on our web site at http://www.njta.com/our-projects/new-jersey-turnpike.  Residents of Jersey City / Hudson County can monitor traffic conditions by accessing Turnpike webcams at http://www.njta.com/travel-resources/camera-list, and http://www.511nj.org/cameras.aspx.  Motorists can also download the SafeTrip App for the latest traffic Advisories.

Read More